|
|

Nacap completed the design, procurement & construction of WMPP Stage 2, Supply System 5 Murray-Culgoa. Works comprised approximately 800km of underground pipelines, 4 storage facilities, 5 pump stations. An innovative PE, vibratory plough technique was utilized to install the 63 & 110mm PE distribution pipeline sections where possible. June 2007 - February 2008
Level 1, 601 Doncaster Road
Doncaster 3108 VIC
Ph: (03) 8848 1888
Fax: (03) 8848 1899
http://www.nacap.com.au
Send Email
More News

Walloons Development Project, Queensland
Construction and testing of a 205km DN450 Grade X70, class 900 pipeline including MLV and off-take facilities to transport gas from Origin’s Wallumbilla Hub Station via the Talinga CSG Production Faci...
Shallow water
Pipeline construction in shallow water conditions is a very specialist activity for crossing the environmental sensitive transition zone between onshore and offshore.
Horizontal Directional Drilling
In addition to Nacap’s micro-tunnelling, hammering and auger-boring capability, we have also established ourselves as leaders in horizontal directional drilling (HDD). With more than ten drilling spre...
Pipelines
Nacap has earned an excellent reputation in pipeline construction, and is strongly positioned in various regions around the world. Over the past 45 years we have laid over 45,000 km of underground pip...
|