Commencing in September of 1991, repair systems using XYPEX Concentrate and XYPEX Patch’n Plug continue to be used in an ongoing program of repair and maintenance of the North and South land driven tunnels and transition tunnels of this renown structure.






45 Union Rd
North Albury 2641 NSW
Ph: (02) 6040 2444
Fax: (02) 6040 2411

Send Email

More News

Roofs, Parkinig & Decks - Goldsborough Mort
A total of 400 cubic metres of concrete was required to complete the deck, with all construction joints treated with XYPEX Concentrate during the construction. Curing was carried out according to spe...


Marine - Mirvac Group - Beacon Cove, Port Melbourne
The 40 mpa concrete podium deck for the Beacon Cove project was waterproofed using Xypex Admix C-1000NF, Xypex Concentrate, Kuniseal Waterstop and Kuniseal Tape. Approximately 1000 cubic metres of co...


Marine - Dee Why Seawall, NSW
Durability was one of the most important features in the design of the new Dee Why Seawall, which required Xypex Admix to be used in the 1200m3 of concrete.


Marine - Scratchley on the Wharf,
XYPEX products were chosen by the Maritime Services Board to repair spalling concrete areas in the splash Zone (1995).


Marine - Chiswick Wharf Ferry Terminal
Because of severe weight restrictions on the pontoon, the concrete cover over reinforcing steel had to be reduced from 65mm to 30mm. Xypex Admix C-2000NF was incorporated in the mix design for the pre...


Tunneling - City Link Project - Melbourne
XYPEX Admix C-1000NF was used to waterproof the concrete pavement and lining walls of the Domain Tunnel in the section of Yarra Crossing Stage 1.


Food Industry - Winemaking Complex
Pokolbin Hunter Valley, NSW - To substantially extend the life of the concrete


Chemical Protection - Environmental Protection - Illawarra Electricity
A Key Issue in Construction of Illawarra Electricity – Transformer Bunds.


Chemical Protection - XYPEX protecting Pasminco’s concrete
The contaminated water pound on Pasminco’s EZ Wharf, Hobart was in need of a coating to compensate for lack of concrete cover over steel reinforcement.


Chemical Protection - Cominco Lead/Zinc Leachate Tanks Trail
Walls, floors and perimeter troughs of four leachate tanks were treated with Xypex Concentrate and Xypex Modified.


Chemical Protection - Dry Kiln, Holbrook, NSW
The dry kiln operated at 100c and 100% humidity.


Sewage & Wastewater - Sewage Digester Tanks
Woodman Point, Perth Western Australia - These new sewerage digesters and gas storage tank had experienced water seepage through floor-wall joints and some other areas of upper level construction.


Sewage & Wastewater - Sewer Tunnels, Madeira Islands (Port)
At this project over ten tonnes of Xypex Concentrate and Modified were sprayed onto gunite concrete (shotcrete).


Sewage & Wastewater - Sewerage Reticulation Plant
Puckapunyal Victoria, Australia - Repair and restoration of this 50 year old plant, located at the Puckapunyal Royal Australian Army Base, was completed using Xypex Patch n Plug and a two coat applica...


Aquariums - Melbourne Aquarium
Xypex Concentrate and Xypex Patch n Plug were used to eliminate all leakages.


Bridges - Caboolture Northern Bypass Project, Smiths Road and Williams Road Overpasses.
Xypex Concentrate was chosen by the Department of Main Roads because of its ability to bridge and seal cracks.


Bridges - Handcock Bridge, Mogareeka, New South Wales
Bega Valley Shire Council engaged Quoney's Maintenance and Waterproofing to prepare and repair the bridge support pylons which were showing visible signs of serious reinforcement corrosion.


Bridges - FUTTER CREEK RAIL BRIDGE GLADSTONE QUEENSLAND
Xypex Concentrate sprayed to over 1200 square meters of concrete to instigate crystalline growth into the structure to provide waterproofing and protection from further deterioration from periodic flo...


Bridges - Qantas Terminal, Sydney Airport
Xypex Concentrate & Modified used in a two coat system to waterproof the overhead roadway at the entrance to the terminal.


Swimming Pools - Medina Apartments - Melbourne
The swimming pool and podium deck are suspended above the car park. All the concrete was treated with XYPEX Admix as well as XYPEX Concentrate & Kuniseal to the floor wall joints.


Swimming Pools - Mentone Grammar Aquatic Centre
All the concrete for the swimming pool was treated with Xypex Admix. Durability and waterproofing were seen as important issues.


Swimming Pools - St Kilda Sea Baths, Melbourne, Victoria
Xypex Concentrate and Xypex Patch n Plug have been used to repair leaking cracks from the negative side of the pool while the pool was in operation.


Shotcrete - Trail Of Elephants Melbourne Zoo
In excess of 160m3 of Shotcrete & insitu concrete was dosed with Xypex Admix C-1000NF in the new Elephant Pool and the balance tank at the Zoo in Melbourne Australia.


Sports Structures - Bruce Stadium - Canberra
Concrete in the exposed Eastern grandstand has been coated with XYPEX Concentrate to waterproof existing cracks and protect the structure from the effects of freeze thaw which occurs in the extremes o...


Sports Structures - VRC Flemington Racecourse, Melbourne
XYPEX Admix C-1000NF is being used to waterproof and protect the plant room and on course TAB computer area.The lift over-run was treated with Xypex Admix C-1000NF and the tie bolt holes patched with ...


Sports Structures - XYPEX protects Stadium Australia
The waterproofing and protection of the 110,000 seat Stadium Australia, along with many other structures, including the ferry terminal at Homebush Bay has been carried out using Xypex products.


Tunneling - INNER CITY BYPASS, BRISBANE. AUSTRALIA
XYPEX Admix C-1000NF was dosed into concrete roof elements of the Landbridge, Inner Northern Busway Tunnel and the RNA Tunnel.


Reservoirs - XYPEX at work for Sydney Water
On completion of the plant’s major containment structure, water leaks and seepage were evident in many areas, particularly from tie bolt holes, construction joints and areas of boney concrete.


Reservoirs - Beechworth Water Storage Facility
A below ground water storage facility built by convicts over 100 years ago was relined by applying over 600 square meters of render, dosed with Xypex Admix C1000 NF and Xycrylic Admix over clay brick ...


Reservoirs - Tangambalanga, Reservoir, Victoria
The structure, a crictical potable water storage facility for a rural community, was losing large amounts of water from numerous vertical and horizontal cracks. Inspection revealed large areas of calc...


Precast - Multi-Purpose Stadium, Melbourne Park
XYPEX Admix C-1000NF was used in the precast plats for this stadium at Melbourne Park. 440 cubic metres of concrete was supplied by Pioneer and construction was by Thiess Contractors Pty Limited.


Precast - Colonial Stadium & Channel 7 Studio
Xypex Admix C1000NF has been dosed into approximately 300m3 for lift pits, and into precast panels for basement walls.


Precast - Watermark Apartments
60 precast panels and the infill concrete were dosed with Xypex Admix to waterproof parts of this structure and improve durability.


Precast - V/Line Train Wash, Melbourne
Almost 700 kgs of Xypex Admix C-2000NF were applied as a waterproofing and durability enhancing additive to the concrete used in the pre-cast panels of this high-tech, automated train washing facility...


Precast - Murray Irrigation - Finley NSW
Xypex Concentrate coating was applied to 50 pipes, to seal fine hairline cracks and for concrete protection.


Roofs, Parkinig & Decks - No.1 Queens Road, Melbourne
Xypex Admix C1000NF has been dosed into approximately 350m3 for Queens Road roof and Xypex Concentrate DS1 to 300m2 to balconies.


Roofs, Parkinig & Decks - Citibank Centre, Sydney
Concrete retaining walls, podium decks and balconies were all waterproofed using Xypex Admix C-1000NF/ C-2000NF and Xypex Concentrate DS1. All construction joints were treated with Xypex Concentrate ...


Basements/Underground - Cement Storage Silo
Xypex Admix C1000NF has been dosed into approximately 400m3 for silo base.


Beechworth Water Storage Facility.
Reservoir: Install lining.

Colonial Stadium & Channel 7 Studio, Dockland, Melbourne - VIC.
Sport structures: Lift pits and pre-cast panels protection

Domain tunnel (Yarra Crossing Stage 1) City Link Project, Melbourne – VIC.
Tunnel: Waterproofing of the concrete pavement and lining walls.

Handcock Bridge, Mogareeka – NSW.
Bridge: Maintenance, waterproofing and repair bridge support pylons.

Residential Units, Surfers Paradise – QLD.
Underground: Waterproofing and protection of concrete.

Scratchley’s on the Wharf, Newcastle - NSW.
Marine: Repair spalling concrete areas in the splash zone.

Sewer Tunnels, Madeira Islands (Port).
Sewer: Epoxy spray on shotcrete.

Sewerage Reticulation Plant.
Sewer: Repair and restoration of 50 year old plant.

Sydney Harbour Tunnel – NSW.
Tunnel: Repair cracks.