Member Login
 Username:
 Password:
 
 

COMPANY/PRODUCT

TENDERS
TRAINING
NEWS
LINKS
FAQ
 

ADD BUSINESS

 

Click photo to enlarge

Line


The contract was for the design, construct and commissioning of the upgrade to the existing two stages of the Sewage Treatment Plant and a new Environmental Protection Treatment Plant for Bribie Island.






Suite 2, Level 4
65 Epping Road
North Ryde 2113 NSW
Ph: (02) 9438 3666
Fax: (02) 9439 7187
http://www.wardgroup.com.au

More News

Environment - CSIRO Basin Upgrade
Excavation of 50,000 cubic metres of material to extend the capacity of existing detention basin. Raising of dam wall and spillway structures.


Environment - 356 Old Windsor Road, Seven Hills
Clearing & remediation of site including treatment of asbestos impacted soils. Construction of flexible & rigid road pavements, stormwater, sewer, water & electrical infrastructure for new development...


Excavation - Ansto - Research Replacement Reactor Project
Site clearing, 15,000 bcm of bulk earthworks for roads. Placement of sub base and base course to roads, installation of stormwater drainage.


Excavation - 599 Pacific Highway, St Leonards
Bulk excavation of 25,000 cubic metres of shale and clay, 1,650 square metres of shotcrete shoring on average 10m deep with temporary anchors. Installation of contiguous piles and steel waler shoring ...


Heavy Lifting
Ward Post Tensioning is one of the few companies that manufacture flat jacks in-house. We offer a total service from start to finish for a wide range of applications and can offer a tailored product f...


Engineering Design
The technical design division of Ward Post Tensioning Pty Ltd offers alternative design solutions for civil, commercial, industrial and residential building projects.


Ward Asbestos Remediation Services
We are pleased to introduce a new service being offered by the Ward Group of companies, the treatment of soils impacted by asbestos in New South Wales, Queensland, Victoria, and the Australian Capital...


Tunnelling - Sewer Diversion Tunnel, Pyrmont
Tunnelling and concrete works including mechanical installation and construction of new screens. Structure is combined sewer/stormwater tunnel 220m long.


Tunnelling - PRL - Epping, Macquarie Park, Delhi Rd, Chatswood Sites
Over a 2 year period works were carried out at up to 12No. different locations along the new Chatswood to Epping rail line


Treatment - Prospect Water Filtration Plant
Bulk excavation, detail excavation, backfilling for major structures.


Treatment - D&C Alliance For TheMaroochydore STP Upgrade
The Maroochydore STP upgrade was carried out to increas the plant's capacity as well as reduce nutrients output.


Treatment - Cascade
Cascade Water Treatment works was a design and construct project for our client CBI Contractors.


Ground Engineering
Ward Post Tensioning use a number of developed ground anchor systems in variable ground conditions including retention systems, dams, hold-down rock anchors and design and construct sand anchors, soil...


Site Preparation - Seahampton Gas Main Relocation
Construction of 350NB temporary bypass gas main pipeline including clearing & grading, locate existing services, trenching, stringing, sand bedding, laying and backfilling. Pipeline welding/NDT, grit ...


Site Preparation - M5 Marsh Street, Entry & Exit Ramps
The job comprised temporary shoring, bulk earthworks, minor roadworks, portal construction for M5 east entry and exit ramps.


Site Preparation - Ansett Domestic Terminal
The redevelopment involves demolishing the Ansett domestic terminal in stages and then rebuilding it to accommodate the increase in traffic during the 2000 Olympics.


Road - Resmed, Stage 3 Norwest Campus
The works included a 2,000m2 of pavements including drainage and excavation, 2,500m2 of on ground concrete slabs, Bulk Excavation of 8,000m2 to accommodate the extension of the existing warehouse.


Road - Parramatta Transport Interchange
Parramatta Transport Interchange is a multi-million dollar refurbishment of Parramatta Railway Station (as part of the Chatswood to Parramatta Rail Link) and the surrounding streets of Parramatta, for...


Road - M5 Marsh Street Road Widening
The works are part of the M5 East motor way construction, entailing widening of Marsh Street for on and off ramps and turning lanes, adding an additional 4 lanes to the existing 4 lane road.


Road - Coffs Harbour Bray St to Arthur St
Scope of work is the reconstruction of the Pacific Highway from Bray Street to Arthur Street, 1.76km north of Coffs Harbour, in an urban area under traffic.


Road - Alpine Way Batter Support
The support of potentially unstable batters at seven separate locations along the Alpine Way at Thredbo


Taxiway Foxtrot - Airport Drains
The project included the repair and reconstruction of the existing grated drain stormwater system located in the area adjacent to Taxiway DOM 1, which runs parallel and directly to the north of the QA...


Sydney International Airport
This project consists of the construction of large advertising signage at the Sydney International Airport.


Multistrand system
The Ward Post Tensioning Multistrand system is designed for use in concrete structures such as silos, segmental bridges, continuously stressed structures and ground anchors. The system is designed int...


Pymble Golf Club - Construction of Weir
Pymble Golf Club requires a weir to hold water for irrigation purposes. Existing weir has limited capacity to supply irrigation for water.


Marine - Lady Robinsons Beach Restoration Stage II
This project involves the construction of six (5) rock groynes, dredging and placement of 300,000m³ sand, transplanting of 6,000m² seagrass and re-vegetation of dune embankments.


Marine - Dawes Point (Tar Ra) Seawall Remediation
Dismantle and rebuild the heritage listed sandstone block seawall.


Marine - Campbells Cove - Boardwalk
Demolition of old wharf. Construction of boardwalk including piling and timberwork.


Landscaping - Victoria Park, Zetland
The site is located to the west of Southern Cross Drive in South Sydney and is part of a large medium density housing development.


Landscaping - Mt Penang Festival Development Project
Primarily a large landscaping project designed as stage 1 of the overall $64 million masterplan for the 156ha Mt Penang site. The works include roadworks, stormwater drainage, precast concrete retaini...


Mining - Vopak Site B Expansion - Port Botany
Extra tanks are required for the expansion of the Vopak Terminal at Port Botany.


Mining - O'Briens Drift Coal Receival Facility
Design and construction of O'Briens Drift Coal Receival Facility Upgrade.


Mining - Berrima - Clinker Storage Facility
Bulk earthworks, reinforced concrete, structural works, slip forming of tower 25m high, inground services.


Environment - Lady Robinsons Beach Restoration
This project involves the construction of six (6) rock groynes, two (2) concrete panel and steel pile groynes, dredging and placement of 150,000 cubic metres sand, transplanting of 1,200 square metres...


Post Tensioning Slabs
The Ward Post Tensioning Slab System has been steadily refined and now features horizontally elongated anchorages and ducting accepting up to five 15.2 mm diameter strands. Such designs are gaining an...


599 Pacific Highway, St Leonards - NSW.
City Excavation Projects: Bulk excavation of 25,000 cubic metres of shale and clay, 1,650 square metres of shotcrete shoring on average 10m deep with temporary anchors. Installation of contiguous piles and steel waler shoring to East boundary building.

Ansett Domestic Terminal, Sydney Domestic Airport - NSW.
Site Preparation Projects: Demolition and re-building of the Ansett domestic terminal as well as an elevated roadway.

Berrima – Clinker Storage Facility.
Industrial and Mining Facilitation Projects: Bulk earthworks, reinforced concrete, structural works, slip forming of tower 25m high, inground services.

Campbells Cove - Boardwalk.
Marine Projects: Demolition of old wharf and construction of boardwalk including piling and timberwork.

Cascade - Mort Street, North Katoomba.
Treatment Plant Projects: Initial site clearing, site establishment, environmental controls, roadworks, pavements and drainage, earthworks, building works and sewer rising main.

Chatswood Connection Access Tunnels, Chatswood - NSW.
Tunnelling Projects: Construction of two tunnels each 20m long, 3.5m wide, 6m high beneath rail track driven through stiff clays and fill material.

CSIRO Basin Upgrade - CSIRO Complex - Prospect.
Environmental and Remediation Projects: Excavation of 50,000 cubic metres of material to extend the capacity of existing detention basin. Raising of dam wall and spillway structures.

International Aquatic Centre Tunnel, Homebush - NSW.
Site Preparation Projects: Construction of entry and exit tunnels using precast concrete arches.

Lady Robinsons Beach Restoration - Sandringham, Dolls Point, Ramsgate, Botany Bay, Sydney - NSW.
Environmental and Remediation Projects: construction of six rock groynes, two concrete panels and steel pile groynes, dredging and placement of 150,000 cubic metres of sand, transplanting of 1,200 square metres seagrass, construction of timber boat ramp and piles for solar navigation lights.

M5 Marsh Street Road Widening - NSW.
Road Works and Bridge Projects: Drainage, pavement construction and traffic management.

Mt Penang Festival Development Project - Pacific Highway, Mount Penang.
Landscaping: Twelve hectare, architecturally-designed festival and events venue.

Pacific Highway from Bray Street to Arthur Street, Coffs Harbour - NSW.
Road Works and Bridge Projects: Reconstruction of 1.76km road in an urban area under traffic.

Prospect Water Filtration Plant.
Treatment Plant Projects: Excavation, laying and backfilling of utility services, design and construct five concrete tanks, minor concrete works, road works, install flexible membrane lining and floating covers to tanks, floating training walls and landscaping.

Sewer Diversion Tunnel, Pyrmont - NSW.
Tunnelling Projects: Tunnelling and concrete works including mechanical installation and construction of new screens.

Shell Refinery, Clyde.
Industrial and Mining Facilitation Projects: Earthworks and associated civil works to form mounded storage for LPG tank facility.

Victoria Park, Zetland.
Landscaping: Services installation, roadworks and landscaping (retaining walls, a basketball court, hitup wall, amenities block and plantings).

World Square - Cnr George, Goulburn, Pitt & Liverpool Sts, Sydney - NSW.
City Excavation Projects: Bulk excavation of 430,000 cubic metres with 2,000 square metres shoring to overburden.