|
|

An ACT Government initiative to improve salinity and flow in the Murray Darling Basin. The commitments lead to the need to establish a hydrological and salinity model to monitor and measure the current and future salt export and water recovery volume at the ACT border. Bill Guy and Partners is developing the hydrological model component of the project which requires the model be established, calibrated and simulated for the period from January 1975 to April 2000 using historical data.
6A Thesiger Court
Deakin 2600 ACT
Ph: (02) 6285 1022
Fax: (02) 6285 2618
Send Email
More News

Waterside Apartments - Minos Pty Ltd
The Waterside Apartments development on the shores of Lake Ginninderra personifies a premier residential development for the growing city of Canberra. The award winning complex was the first multi-sto...
City Edge Apartments - CIC / Pendon Joint Venture
Set in the inner northern suburb of O’Connor, this development represents a major site rejuvenation in one of Canberra’s oldest suburbs. CIC / Pendon Joint Venture undertook to knock down and rebuild ...
East O'Malley - Xriso
Bill Guy & Partners was the project manager for this prestigious development adjoining the established area of O’Malley which is the site of many diplomatic residences. The development consists of sev...
Lake Ginninderra Probable Maximum Flood Protection
The ACT has an extensive network of artificial lakes and ponds that complement the residential centres of Canberra. Lake Ginninderra is the second largest of the lakes in the ACT; there are also urban...
Forde Residential Estate
In conjuction with Delfin Lend Lease and Canberra Investment Corporationpreparation of the Estate Development Plan for stages 4 and 5 of the estate for approximately 530 blocks, provision of design and documentation phase services for stages 2 comprising a mix of commercial, institutional and residential areas and provision of design and documentation phase services for stages 4 and 5 for the estate. Project value in excess of $29.0m
Dunlop 5 West Residential Estate
Preparation of the Estate Development Plan, provision of design, documentation and construction phase services for the estate comprising approximately 287 dwellings including a demonstration housing development. The project also includes the provision of on road cycling on Kerrigan Street. Project value $7.7m
Flemington Road Wetlands
Design, documentation and construction phase services for a wetland on Sullivans Creek near the Canberra Racecourse. The project focus is on both stormwater management and the creation of a conservation area to be used for recreational, educational and environmental purposes. It is to draw together previous studies carried out on Sullivans Creek and incorporate recent planning, existing development and future infrastructure developments and develop an effective strategy to control stormwater flows
Wells Station Drive
Design, documentation and construction phase services for an arterial road linking Gungahlin Drive with Horse Park Drive. The design includes upgraded traffic signals at Gungahlin Drive, a large two lane roundabout at the intersection of Wells Station Drive and Hoskins Street, upgrading the northern end of Hoskins Street to two lane dual carriageway and traffic signals at both Flemington Road and Horse Park Drive intersections with Wells Station Drive.
Harrison School access road
Design, documentation and construction phase services for Mapleton Avenue, and the school access road which links Mapleton Avenue and Nullabor Avenue and associated infrastructure to service the new school which is currently under construction at Harrison. Project value $4.2m.
Kangarra Waters Retirement Village for the Illawarra Retirement Trust
Design and documentation of the building hydraulic services including sanitary drainage, hot and cold water reticulation, stormwater collection and reuse, fire hydrants, fire hose reels and sprinklers, hydrotherapy pool and swimming pool hydraulics, filtration and heating works for the $65m 250 unit retirement village located off Joy Cummings Place in Belconnen
St Andrews Retirement Village, Hughes
Design and documentation of the building hydraulic services and civil works for the 75 room assisted care facility being stage four of the retirement village development. The company provided similar services for the balance of the project over the past decade bringing the final development to 185 rooms plus 32 townhouses.
Hardened Network Area, Adelaide
Team member addressing the civil and infrastructure works for the preparation of a Strategic Business Case and a Tender Design Brief for the $600m development for the new mechanical battalion for the Australian Army adjacent to the Edinburgh RAAF Base in Adelaide.
Taralga Sewerage Scheme
Design and documentation of a sewerage scheme for the township of Taralga including reticulation, treatment plant, pump stations and maturation lagoons.
North Weston Civil Engineering
Planning study to develop road access options into the area from the existing road infrastructure including Cotter Road and Streeton Drive, assess bridge option crossings for crossing of the Molonglo River to serve future development to the north, develop options for a proposed water quality control pond and major landscape feature on Weston Creek including assessment of options to protect or relocate the Molonglo Valley Interceptor Sewer (MVIS).
|