About Ward Civil and Environmental Engineering Pty Ltd

Ward Group provides the resources to carry out any contract relating to civil, environmental and ground engineering and plant hire.


Expertise

Bridge Construction
Abutment Walls
Builders
Filtration Plants
Excavation
Tailing Dams , Trenching
Foundation Services
Anchors , Bank Stabilisation , Bush Rocks , Retaining Walls , Rock Anchors , Rock Mattresses , Sandstone , Wick Drains
Hazardous Material
Asbestos Removal
Landscaping Services
Landscape Construction
Marine Construction
Canal Construction , Ports , Rock Groynes , Wharf
Remediation Services
Land Remediation , Site Remediation
Road Construction
Freeways , Roads
Tunnel Construction
Large Tunnelling , Small-Med Tunnelling
Water Infrastructure
Drainages
Water Management
Treatment Plants

Company Information

Certifications:
Quality Management System Standard AS/NZS ISO 9001:2000.
Environmental Management System certified to AS/NZS ISO 14001:1996.
AS/NZS ISO 4801:2001, Occupational Health & Safety Management Systems.
The company is accredited with the NSW Department of Commerce Best Practice Contractor as well as the Australian Government Building and Construction OH&S Accreditation Scheme. Ward is also prequalified to undertake projects with the NSW Roads and Traffic Authority. Ward's Business Management System is quality certified to AS/NZS 9001:2000 and incorporates occupational health and safety management certified to AS/NZS 4801:2001 and environmental management certified to AS/NZS ISO 14001:2004.

Brands:
Civil Engineering
Environmental Engineering
Ground Engineering
Plant Services

Key Managers:
Glenn Cherrie - Managing Director

Date Established: 1972
Number of employees:  150



More News

Environment - CSIRO Basin Upgrade
Excavation of 50,000 cubic metres of material to extend the capacity of existing detention basin. Raising of dam wall and spillway structures.


Environment - 356 Old Windsor Road, Seven Hills
Clearing & remediation of site including treatment of asbestos impacted soils. Construction of flexible & rigid road pavements, stormwater, sewer, water & electrical infrastructure for new development...


Excavation - Ansto - Research Replacement Reactor Project
Site clearing, 15,000 bcm of bulk earthworks for roads. Placement of sub base and base course to roads, installation of stormwater drainage.


Excavation - 599 Pacific Highway, St Leonards
Bulk excavation of 25,000 cubic metres of shale and clay, 1,650 square metres of shotcrete shoring on average 10m deep with temporary anchors. Installation of contiguous piles and steel waler shoring ...


Heavy Lifting
Ward Post Tensioning is one of the few companies that manufacture flat jacks in-house. We offer a total service from start to finish for a wide range of applications and can offer a tailored product f...


Engineering Design
The technical design division of Ward Post Tensioning Pty Ltd offers alternative design solutions for civil, commercial, industrial and residential building projects.


Ward Asbestos Remediation Services
We are pleased to introduce a new service being offered by the Ward Group of companies, the treatment of soils impacted by asbestos in New South Wales, Queensland, Victoria, and the Australian Capital...


Tunnelling - Sewer Diversion Tunnel, Pyrmont
Tunnelling and concrete works including mechanical installation and construction of new screens. Structure is combined sewer/stormwater tunnel 220m long.


Tunnelling - PRL - Epping, Macquarie Park, Delhi Rd, Chatswood Sites
Over a 2 year period works were carried out at up to 12No. different locations along the new Chatswood to Epping rail line


Treatment - Prospect Water Filtration Plant
Bulk excavation, detail excavation, backfilling for major structures.


Treatment - D&C Alliance For TheMaroochydore STP Upgrade
The Maroochydore STP upgrade was carried out to increas the plant's capacity as well as reduce nutrients output.


Treatment - Cascade
Cascade Water Treatment works was a design and construct project for our client CBI Contractors.


Treatment - Bribie Island Sewage Treatment Plant Upgrade
The contract was for the design, construct and commissioning of the upgrade to the existing two stages of the Sewage Treatment Plant and a new Environmental Protection Treatment Plant for Bribie Islan...


Ground Engineering
Ward Post Tensioning use a number of developed ground anchor systems in variable ground conditions including retention systems, dams, hold-down rock anchors and design and construct sand anchors, soil...


Site Preparation - Seahampton Gas Main Relocation
Construction of 350NB temporary bypass gas main pipeline including clearing & grading, locate existing services, trenching, stringing, sand bedding, laying and backfilling. Pipeline welding/NDT, grit ...


Site Preparation - M5 Marsh Street, Entry & Exit Ramps
The job comprised temporary shoring, bulk earthworks, minor roadworks, portal construction for M5 east entry and exit ramps.


Site Preparation - Ansett Domestic Terminal
The redevelopment involves demolishing the Ansett domestic terminal in stages and then rebuilding it to accommodate the increase in traffic during the 2000 Olympics.


Road - Resmed, Stage 3 Norwest Campus
The works included a 2,000m2 of pavements including drainage and excavation, 2,500m2 of on ground concrete slabs, Bulk Excavation of 8,000m2 to accommodate the extension of the existing warehouse.


Road - Parramatta Transport Interchange
Parramatta Transport Interchange is a multi-million dollar refurbishment of Parramatta Railway Station (as part of the Chatswood to Parramatta Rail Link) and the surrounding streets of Parramatta, for...


Road - M5 Marsh Street Road Widening
The works are part of the M5 East motor way construction, entailing widening of Marsh Street for on and off ramps and turning lanes, adding an additional 4 lanes to the existing 4 lane road.


Road - Coffs Harbour Bray St to Arthur St
Scope of work is the reconstruction of the Pacific Highway from Bray Street to Arthur Street, 1.76km north of Coffs Harbour, in an urban area under traffic.